From Greenview Gardens (1974) to The Belcher's and 80 Robinson Road (2000s), Mid-Levels West spans five decades of buildings and generous flat sizes — so every renovation starts from a different place. We are on site at The Rednaxela and Greenview Gardens right now. Here is what neighbours ask us most, plus layouts and real budgets estate by estate.

12F27F28F51F63F
5 estates

02Work in progress

On site now

Real estate, real size, real numbers — published with the owners' consent. We never disclose floor or flat numbers.

Work in progress2026-09 · 986 sq ft

Greenview Gardens · 986 sq ft full renovation

A full renovation of a 1974 flat: new wiring and consumer unit, new hot and cold water pipes, kitchen and bathroom tiling and waterproofing, painting and flooring throughout, and new kitchen and bathroom walls.

Project log

  1. 2026-09-11

    Site measure and quote

  2. 2026-09-14

    Contract signed, deposit paid

  3. 2026-09

    Works insurance in place

  4. In progress · log updated as we go

  5. Wiring & plumbing → tiling & waterproofing → carpentry & painting

  6. Sign-off and handover

Work in progress2026-09 · 645 sq ft

The Rednaxela · 645 sq ft full renovation for an expat owner

From a Threads message to an online quote, contract and start on site in under a month. As the building is older, the flat gets a full rewire and replumb, new aluminium windows, tiling and painting — and the kitchen opens up to the living room. Everything in English, end to end.

Project log

  1. 2026-09-18

    Online quote, contract signed

  2. 2026-09

    Work starts on site

  3. Additions agreed: new windows, external gas pipe, extra electrical points

  4. In progress · log updated as we go

  5. Timber floors, painting, handover

Instagram Reel · 西半山帝華台 · 開工直擊 · @ease.designstudio

Work in progress2026-10 · 439 sq ft

Chi Fu Fa Yuen · 439 sq ft two-bed, Block 14

A 1978 two-bed redone from the shell: kitchen and bathroom retiled and waterproofed, full rewire with a new consumer unit, a slatted kitchen slider and lighting channel — and every window replaced in bronze-finish aluminium.

Project log

  1. 2026-10-03

    Site measure and quote

  2. 2026-10

    Contract signed, first payment

  3. Management application, preparing to start

  4. Strip-out → wiring & plumbing → tiling → windows → carpentry & painting → sign-off

03Good to know

Renovating in Mid-Levels West

01

Steep roads, loading and lifts

Many Mid-Levels buildings sit on steep roads with limited loading space, so deliveries and debris removal are booked with management in advance, and large items (stone worktops, bathtubs) are checked against lift dimensions first. We arrange all of it before work starts.

02

Building age sets the scope

1970s buildings usually need new wiring, a new consumer unit and new pipes, plus window and building inspection orders. 2000s estates are mostly reaching their first major refit: bathroom waterproofing, kitchens and storage. Each estate page lists what applies at its age.

03

Bilingual, expat-friendly

Our client at The Rednaxela works in Hong Kong from overseas: from a Threads message and an online quote to signing and starting work took under a month, all in English. Itemised quotes, staged payments — each paid only after you sign off the stage.

WhatsApp 查詢
WhatsApp 聯絡我們